4 Steps for a success scale-up

If you’ve proven your product on a pilot line, and it’s time to turn up real-world production, beware because many companies stumble on their first large-scale build.
Before you pour concrete or sign any equipment orders, look at the full landscape of challenges: engineering, supply chain, utilities, and the human relationships that hold it all together. Scaling up isn’t as simple as adding another shift. It’s multiplying everything you do by orders of magnitude.
Moving from pilot lots to commercial volumes often means a 1,000- to 10,000-fold jump in throughput, with megawatts of electrical load, and water usage that can rival a small town. Construction alone can run $300- to $950-per-square-foot before a single machine is installed on the floor. Miss the mark and the cost isn’t just financial; it’s reputational. Schedule slips, lost customers, and bruised reputations follow fast.
To move from pilot line to production line with confidence, follow these four steps for a successful scale-up.
Master the process
First, nail down the process by mapping the critical quality parameters like temperature, humidity, pressure, cycle time, purity, and set hard limits for each. Then, stress test them, and challenge your R&D team better. Run design-of-experiments on the pilot line or in a digital model to reveal where small shifts can trigger big cost savings. For instance, one client learned that relaxing humidity from 1% to 5% would half HVAC tonnage and save millions in capital expenditures and operating expenditures—proof that tiny tweaks can save a budget.
By truly grasping the process, you can size every supporting element—utilities, material flow, staffing, and automation—as one integrated system rather than a patchwork of guesses. Capture the data, lock the findings into a concise process design package, and carry that document forward. When you know exactly what the process is, the next steps become simpler and cheaper.
Don’t underestimate planning
Start with the end in mind by defining must-hit key performance metrics (KPIs) and assign a value to each. Look past day one, and sketch how the site should flex five, 10 or even 15 years out to ensure that any expansion won’t require a new round of demolition. Build your budget around total cost of ownership because operating expenses usually eclipse capital expenses within the first few years.
Early in design, run what-if scenarios on power, water, logistics, and labor to see where small changes may unlock big lifetime savings. A solid plan also links directly to the process data you just captured, allowing you to size utilities, floor space, and headcount as one coherent ecosystem instead of a series of isolated line items. Always remember that good planning can overcome poor execution, but poor planning can’t be overcome by the best project execution.
Find the right team
Scaling up succeeds or fails on people. Name a dedicated project leader with the authority to make fast decisions and free that person from the distractions of their current day job. Build a core owner’s team that blends operations, engineering, finance, with environmental, health, and safety, so that key decisions are vetted through multiple lenses in real time. When selecting outside partners, look for firms with proven scale-up experience and incentives that align with yours. Create mutually beneficial contracts that keep everyone rowing in the same direction.
Onboard partners early, regularly co-locate them physically or in a virtual war room, and encourage short, recurring stand-ups to surface issues before they become costly delays. A well-constructed, well-aligned team will turn your solid plan into an on-time, on-budget reality. The wrong team will burn through schedule, cash, and goodwill faster than any technical misstep.
Implement strong management
Once ground is broken, disciple becomes the differentiator. Put a seasoned program manager at the helm to own the master schedule, budget, and KPI dashboard. Resist the temptation to micromanage the process, rather schedule regular data-driven reviews that spotlight variances early while they are still cheap to fix. Pair that oversight with a formal management-of-change process, changes to scope, design, or materials routes through a single, transparent workflow that weights cost, timeline, safety, and regulatory impact before approval.
Finally, capture lessons learned in real-time, not at project closeout, so improvements feed straight back into construction and into future scale-ups. Strong, visible management turns a good team and a good plan into a plant that starts up on time and performs from day one.
Do these four things well, and your new facility won’t merely open on schedule, it will deliver the throughput, quality, and cost profile that turns a promising idea into a market-shaping reality.
Mike Sewell is director of innovation at Gresham Smith.